Electrical Engineer (senior/lead)ID:27005
5,000 MYR ~ 10,000 MYRBangsar3个月以上前概述
薪资
5,000 MYR ~ 10,000 MYR
产业类别
Real Estate, Civil Engineering/Architecture, Other
工作内容
Lead Engineer shall have capability of engineering, design, and verification of the electrical systems of the plant based on the Project Specifications, TPSC standards, all applicable design codes, laws, and permits. The Engineer shall have own experiences and capability to design following documents even they may be prepared by Discipline Engineers. This requirement to Engineer’s personal experiences of design shall be applicable for any other documents that are to be checked or approved by the Engineer.
a) Single Line Diagrams (SLD)
- Overall Key SLD
- Switchyard SLD
- MV/LV SWGR SLD
- DC/UPS SLD
- Distribution panel SLD
b) Electrical Load List
c) System Studies
d) System studies shall, but not limited to, the following.
- Short circuit study
- Load flow study
- Voltage drop study
- Transient stability study
e) Electrical Logic Diagram
- Overall electrical trip logic
- HV switchyard
- MV/LV switchgear
- Emergency diesel generator(EDG)/Black start diesel enerator(BSDG)
f) Electrical system philosophy
The document shall describe detail operational philosophy and shall cover entire electrical system including generation systems and high voltage switchyard.
g) Sizing Calculation
- Generator step up transformer (GSUT) sizing
- Unit auxiliary transformer (UAT) sizing
- LV auxiliary transformer sizing
- DC battery and charger sizing
- UPS sizing
- EDG/BSDG sizing
h) Protective Relay Coordination
The Engineer shall be responsible for ensuring that the relay coordination including HV switchyard, MV/LV SWGR and MCC, and EDG/BSDG relay settings by using ETAP software.
i) Design Interface with Owner/other supplier
Engineer shall coordinate technical detail with gas turbine / steam turbine supplier for generator unit and with Owner for the interface between plant switchyard and power grid.
j) Electrical BOP Specification
Project specific equipment specifications and data sheets for all balance-of-plant (BOP) electrical equipment. This shall be used for Request for Quotation as part of technical specification.
k) Signal Exchange List
Prepare signal exchange list showing the interconnecting control wiring for all electrical equipment. Each circuit breaker, starter, protective relay circuit, interface with the DCS, generator unit, power grid and vendor supplied equipment shall be clearly shown.
资格
应征条件
MUST Experience in Thermal Power Plant
Min 5(Five) years experience as electrical design engineer英文
-
其他语言
English
附加信息
福利制度
-
工作时间
8:45 ~ 17:30
假日
Monday-Friday
as a callendar职业类别